Show All Products

MATH 533 All Weeks 2, 6, 7 | Complete Course Project Part A, B, C

MATH 533 All Weeks 2, 6, 7 | Complete Course Project Part A, B, C

All Parts of Course Project - Bundled MATH 533 Week 2 | Course Project | Part A: Exploratory Data Analysis MATH 533 Week 6 | Course Project | Part B: Hypothesis Testing and Confidence  MATH 533 Week 7 | Course Project | Part C: Regression and Correlation Analysis Note: This Bundle is cheaper than the individual parts of Course Project...

$50.00

MATH 533 All Weeks | All Discussion Questions

MATH 533 All Weeks | All Discussion Questions

All DQs (Bundled) MATH 533 Week 1 | DQ: Graphing Data | Media Preference (Version 1)  -- $8.00 MATH 533 Week 1 | DQ: Graphing Data | USA Immigration (Version 2)  -- $8.0 MATH 533 Week 2 | DQ: Binomial Distribution  -- $8.0 MATH 533 Week 5 | DQ: Hypothesis Testing  -- $8.0 MATH 533 Week 6 | DQ: Correlation Coefficient  -- $8.0 MATH 533 Week 7 | DQ: Reject the Null Hypothesis  -- $8.0 Note: This Bundle is cheaper than the individual Discussions...

$35.00

MATH 533 All Weeks | All Quizzes

MATH 533 All Weeks | All Quizzes

All Quizzes of Term (Bundled) Week 1 | Quiz  (Questions: 1-20)  -- $10.00 Week 2 | Quiz  (Questions: 1-8)  -- $10.00 Week 3 | Quiz  (Questions: 1-9)  -- $10.00 Week 4 | Quiz  (Questions: 1-10)  -- $10.00 Week 5 | Quiz  (Questions: 1-13)  -- $10.00 Week 7 | Quiz  (Questions: 1-5)  -- $10.00 Note: This Bundle is cheaper than the individual Quizzes...

$45.00

MATH 533 All Weeks | Homework

MATH 533 All Weeks | Homework

All Homework Assignments of Term (Bundled) Week 1 | HomeworkHomework Problems: Questions: 1-8 Week 2 | HomeworkHomework Problems: Questions: 1 (a to d) Week 2 | Textbook Homework QuestionsHomework Problems: Questions: 1-8..

$20.00

MATH 533 Week 1 | DQ: Graphing Data | Media Preference (Version 1)

MATH 533 Week 1 | DQ: Graphing Data | Media Preference (Version 1)

Media Preference (Version 1)For this discussion, you will use VoiceThread technology. Under the Introduction and Resources area there is a link to VoiceThread that includes videos on how to use this technology. For this discussion, first find or create a data set. Then, create a graph from those data. Your post should be a VoiceThread that explains how you created the graph and why you selected the graph that you did. In your responses to other students, discuss the type of data as well as what ..

$5.00

MATH 533 Week 1 | DQ: Graphing Data | USA Immigration (Version 2)

MATH 533 Week 1 | DQ: Graphing Data | USA Immigration (Version 2)

USA Immigration (Version 2)For this discussion, you will use VoiceThread technology. Under the Introduction and Resources area there is a link to VoiceThread that includes videos on how to use this technology. For this discussion, first find or create a data set. Then, create a graph from those data. Your post should be a VoiceThread that explains how you created the graph and why you selected the graph that you did. In your responses to other students, discuss the type of data as well as what o..

$5.00

MATH 533 Week 1 | Homework Problems

MATH 533 Week 1 | Homework Problems

Homework Problems: Questions: 1-8Question 1:Suppose you are given a data set that classifies each sample unit into one of four categories: A, B, C, or D. You plan to create a computer database consisting of these data, and you decide to code the data as A=1, B=2, C=3, and D=4. Are the data consisting of the classifications A, B, C, and D qualitative or quantitative? After the data are input as 1, 2, 3, or 4, are they qualitative or quantitative?A. Quantitative, because they can only be classifie..

$10.00

MATH 533 Week 1 | Quiz

MATH 533 Week 1 | Quiz

Questions: 1-20Q1.Suppose you're given a data set that classifies each sample unit into one of four categories: A, B, C, D. You plan to create a computer database consisting of these data, and you decide to code the data as A = 1, B = 2, C = 3, and D = 4. Are the data consisting of classification A, B, C, and D qualitative and quantitative? After the data are input as 1, 2, 3 or 4, are they qualitative or quantitative? Q2.A company tracked all credit card purchases during the year 2005 and ..

$10.00

MATH 533 Week 2 | Course Project | Part A: Exploratory Data Analysis

MATH 533 Week 2 | Course Project | Part A: Exploratory Data Analysis

Part A: Exploratory Data Analysis Preparation: ·       Open the files for the course project and the data set.·     For each of the five variables, process, organize, present and summarize the data. Analyze each variable by itself using graphical and numerical techniques of summarization. Use Excel as much as possible, explaining what the results reveal. Some of the following graphs may be helpful: stem-leaf diagram, frequency/relative frequency t..

$15.00

MATH 533 Week 2 | DQ: Binomial Distribution

MATH 533 Week 2 | DQ: Binomial Distribution

What is Binomial Distribution?..

$5.00

MATH 533 Week 2 | Homework Problems

MATH 533 Week 2 | Homework Problems

Homework Problems: Questions: 1 (a to d) 1.   Many primary care doctors feel overworked and burdened by potential lawsuits. In fact, a group of researchers reported that 64% of all general practice physicians do not recommend medicine as a career. Let x represent the number of sampled general practice physicians who do not recommend medicine as a career. Complete parts a through d. a.  Explain why x is approximately a binomial random variable. b.  Use the researchers' ..

$10.00

MATH 533 Week 2 | Quiz

MATH 533 Week 2 | Quiz

Questions: 1-8Q1.A finance journal published a study of whether the decision to invest in the stock market is dependent on IQ. Information on a sample of 153,401 adults living in Finland formed the database for the study. An IQ score  (from a low score of 1 to a high score of  9) was determined for each Finnish citizen as well as whether or not the citizen invested in the stock market. The following table gives the number of Finnish citizens in each IQ  score/investment category. ..

$10.00

MATH 533 Week 2 | Textbook Homework Questions

MATH 533 Week 2 | Textbook Homework Questions

Homework Problems: Questions: 1-8 3.36 The Organization Development Journal (Summer 2006) reported on the results of a survey of human resource officers (HROs) at major employers located in a southeastern city. The focus of the study was employee behavior, namely absenteeism, promptness to work, and turnover. The study found that 55% of the HROs had problems with employee absenteeism; also 41% had problems with turnover. Suppose that 22% of the HROs had problems with both absenteeism and turnov..

$10.00

MATH 533 Week 3 | Quiz

MATH 533 Week 3 | Quiz

Questions: 1-9Q1.The ages of a group of 50 women are approximately normally distributed with a mean of 47 years and a standard deviation of 6 years. One woman is randomly selected from the group, and her age is observed.a.  Find the probability that her age will fall between 53 and 62 years.b.  Find the probability that her age will fall between 46 and 54 years.c.  Find the probability that her age will be less than 32 years.d.  Find the probability that her age will exceed 4..

$10.00

MATH 533 Week 4 | Quiz

MATH 533 Week 4 | Quiz

Questions: 1-10Q1. A random sample of 89 observations produced a mean x = 25.7 and a standard deviation s=2.5. a.  Find a 95% confidence interval for u. b.  Find a 90% confidence interval for u. c.  Find a 99% confidence interval for u. Q2. A company wants to test a randomly selected sample of n water specimens and estimate the mean daily rate of pollution produced by a mining operation. If the company wants a 95% confidence interval estimate with a sampling error of 1.1 mil..

$10.00

MATH 533 Week 5 | DQ: Hypothesis Testing

MATH 533 Week 5 | DQ: Hypothesis Testing

Hypothesis Testing: DefinitionHypothesis Testing: Example 1Hypothesis Testing: Example 2Hypothesis Testing: Reference..

$5.00

MATH 533 Week 5 | Quiz

MATH 533 Week 5 | Quiz

Questions: 1-13Q1.A professor at a local university conducted a survey of 135 businesses in a city to determine what motivates small businesses to export their products. The CEOs were asked to respond to the statement? "Management believes that the business can achieve economies of scale by? exporting" on a scale of 1? (strongly disagree) to 5? (strongly agree). Summary statistics for the n=135 scale scores were reported as x=3.83 and s=1.4 In his? study, the professor hypothesized that if the t..

$10.00

MATH 533 Week 6 | Course Project | Part B: Hypothesis Testing and Confidence Intervals

MATH 533 Week 6 | Course Project | Part B: Hypothesis Testing and Confidence Intervals

Part B: Hypothesis Testing and Confidence IntervalsComplete the following four hypotheses, using ? = 0.05 for each.1.  Mean sales per week exceeds 41.5 per salesperson2.  Proportion receiving online training is less than 55%3.  Mean calls made among those with no training is less than 1454.  Mean time per call is greater than 15 minutes Report Requirements 1)  Using the same data set from part A, perform the hypothesis test for each speculation in order to see if ..

$15.00

MATH 533 Week 6 | DQ: Correlation Coefficient

MATH 533 Week 6 | DQ: Correlation Coefficient

What is the correlation coefficient, r and how is it related to the coefficient of Determination, r^2?..

$5.00

MATH 533 Week 7 | Course Project | Part C: Regression and Correlation Analysis

MATH 533 Week 7 | Course Project | Part C: Regression and Correlation Analysis

Part C: Regression and Correlation Analysis Use the dependent variable (labeled Y) and one of the independent variables (labeled X1, X2, and X3) in the data file. Select and use one independent variable throughout this analysis. Use Excel to perform the regression and correlation analysis to answer the following.1.  Generate a scatterplot for the specified dependent variable (Y) and the selected independent variable (X), including the graph of the "best fit" line. Interpret.2.  Determ..

$15.00

MATH 533 Week 7 | DQ: Reject the Null Hypothesis

MATH 533 Week 7 | DQ: Reject the Null Hypothesis

When we reject the null hypothesis and we fail to reject the null hypothesis. Explain both the approaches, using the rejection region and the p-value...

$5.00

MATH 533 Week 7 | Quiz

MATH 533 Week 7 | Quiz

Questions: 1-5Q1.Suppose you fit the first-order multiple regression model Y = B0 + B1X1 + B2X2 + e to n = 25 data points and obtain the prediction equation Y = 50.11 + 5.44X1 + 1.33X2. The estimated standard deviations of the sampling distributions of B1 and B2 are 0.98 and 0.25, respectively.a.  Test H0: B2 = 0 against Ha: B2 > 0. Use Alpha = 0.10. to find this out determine test statistic and P-valueb.   Find a 99% confidence interval ..

$10.00

MATH 533 Week 8 | Final Exam Study Guide

MATH 533 Week 8 | Final Exam Study Guide

Question/Answers: You should work each of the following on your own, then review the solution’s guide. DO NOT look at the solution’s guide first.1.  The following numbers represent the weights in pounds of six 7-year old children in Mrs. Jones' second grade class (25, 60, 51, 47, 49, 45). Find the mean, median, mode, variance, and standard deviation.2.  If the variance is 846, what is the standard deviation?3.  If we have the following data: 34, 38, 22, 21, 29, 37, 40, 41, 22..

$15.00

MGMT 404 All Weeks (1-7) Discussions

MGMT 404 All Weeks (1-7) Discussions

Week 1 to Week 7 Discussion Questions (Bundled) MGMT 404 Week 1 Discussion 1 Case Study: Keflavik Paper Company (Graded) -- $5.00 MGMT 404 Week 1 Discussion 2 Case Study: Widgets ‘R Us (Graded) -- $5.00 MGMT 404 Week 2 Discussion 1 Project Scope (Graded) -- $5.00 MGMT 404 Week 2 Discussion 2 Case Study Project Management at Dotcom.com (Graded) -- $5.00 MGMT 404 Week 3 Discussion 1 Project Schedule (Graded) -- $5.00 MGMT 404 Week 3 Discussion 2 Agile Schedule Developm..

$50.00

MGMT 404 All Weeks (1-8) Course Project

MGMT 404 All Weeks (1-8) Course Project

Complete Course Projects including All Weeks (1-8) Elements - (Bundled) MGMT 404 Course Project Week 1 -- $15.00 MGMT 404 Course Project Week 2 -- $15.00 MGMT 404 Course Project Week 3 -- $15.00 MGMT 404 Course Project Week 5 -- $15.00 MGMT 404 Course Project Week 6 -- $15.00 MGMT 404 Course Project Week 7 -- $15.00 MGMT 404 Course Project Week 8 (Final Project Package) -- $35.00 Note: This Bundle is cheaper than the individual project Deliverable..

$55.00

MGMT 404 All Weeks (4 & 7) Quizzes

MGMT 404 All Weeks (4 & 7) Quizzes

Week 4, Week 7 (v1) & Week 7 (v2) Quizzes - Bundled MGMT 404 Week 4 Quiz 1.   (TCO 1) Which document is created during the initiation phase of a project? (Points : 5)2.   (TCO 1) Projects have specific attributes. Which of the following is not an attribute of a project? (Points : 5)3.   (TCO 1) The purpose of a project charter is to4.   (TCO 1) Which document on a project authorizes the project manager to begin work on the project? (Points : 5)5.&n..

$20.00

MGMT 404 Week 1 Discussion 1 | Case Study: Keflavik Paper Company

MGMT 404 Week 1 Discussion 1 | Case Study: Keflavik Paper Company

Case Study Read Case Study 3.1: The Keflavik Paper Company is a case with a problem in determining a project management process for new product development. Answer The Following Questions:What does this case demonstrate about the effect of poor project screening methods on a firm’s ability to manage projects effectively?How would project portfolio management help to improve the situation at Keflavik?..

$5.00

MGMT 404 Week 1 Discussion 2 | Case Study: Widgets ‘R Us

MGMT 404 Week 1 Discussion 2 | Case Study: Widgets ‘R Us

Case Study  Read Case Study 2.4: The Widgets ‘R Us case study is a case with a problem of how the company is set up and how the company will handle operations with its projected growth. Answer The Following Questions: You have been called in as a consultant to analyze the operations at WRU. Based on the readings, what would you advise Widgets ‘R Us to do in order to sustain the competitive advantage in the widget market? What structural design changes might be undertaken to impr..

$5.00

MGMT 404 Week 1 | Course Project: Project Proposal/Approval

MGMT 404 Week 1 | Course Project: Project Proposal/Approval

Due Week 1: Project Proposal/ApprovalEach professor will decide if the course will have project teams or be assigned to each individual student to complete the course project. Your professor will notify you of the decision and if the course is going to have project teams, you will be notified of your team assignment. If the professor assigns individual projects, your Week 1 assignment will be to:Provide an outline of your proposed project to your instructor for approval. The project you select w..

$15.00

MGMT 404 Week 2 Discussion 1 | Project Scope

MGMT 404 Week 2 Discussion 1 | Project Scope

Project Scope – 67 Pages As we have seen this week, project scope creation is very different in traditional project management versus Agile project management. What advantages and disadvantages can you see with the process of scope creation in the traditional project management world? What advantages and disadvantages can you see with the process of scope creation in the Agile project management world? Share your experiences with projects that were created using either Agile or traditional ..

$5.00

MGMT 404 Week 2 Discussion 2 | Case Study: Project Management at Dotcom.com

MGMT 404 Week 2 Discussion 2 | Case Study: Project Management at Dotcom.com

Case Study: Project Management at Dotcom.com – 65 Pages Read Case Study 5.3: Project Management at Dotcom.com. Dotcom.com is a software engineering and systems development consulting firm that needs some organizational improvements in the area of project management processes that will cut cost and potentially increase the profit margin for the company. Answer The Following Questions: Discuss how you would begin redesigning dotcom.com’s project management processes to minimize the p..

$5.00

MGMT 404 Week 2 | Course Project: Project Charter

MGMT 404 Week 2 | Course Project: Project Charter

Due Week 2: Project Charter Provide a project charter of your selected project in accordance with the charter template found in Doc Sharing.Please put this in proper business writing format. Consider me to be your boss. If working in a group, include the updated Statement of Participation for Week 2, describing how each person contributed to this project deliverable. Please place the updated Statement of Participation in your teams’ Doc Sharing area for review. A charter should be a minimum of ..

$15.00

MGMT 404 Week 3 Discussion 1 | Project Schedule

MGMT 404 Week 3 Discussion 1 | Project Schedule

Project Schedule (Graded) To develop a schedule for a project, we will use the concept of a project network, which shows work activities taken from the work breakdown structure and is organized according to the logical flow in time and relationships governing when the work will be performed. By combining this network of work activities with estimates of the time duration for performing each of the activities, we can create a schedule for the project work. What types of information can we le..

$5.00

MGMT 404 Week 3 Discussion 2 | Agile Schedule Development

MGMT 404 Week 3 Discussion 2 | Agile Schedule Development

Agile Schedule Development (Graded)As we have seen, traditional and Agile schedule developments are quite different. Agile project management was originally developed to do software development. Could a traditional process be successfully used to develop a new software program? Why or why not? Could an Agile methodology be used to build a strip mall in your home town? Why or why not? Does it require more or less resources to perform tasks in parallel?… What that said, what, in your opinion, do ..

$5.00

MGMT 404 Week 3 | Course Project: Scope Statement

MGMT 404 Week 3 | Course Project: Scope Statement

Due Week 3: Scope StatementPrepare a scope statement using the template in Doc Sharing. Remember to be tangible, measurable, and specific. Be sure to include all sections required in the Week 2 Lecture. A scope should be a minimum of 10–15 pages long.Deliverables for Week 3:Project Scope Statement (in MS Word)Statement of Participation and status update..

$15.00

MGMT 404 Week 4 Discussion 1 | Risk Management

MGMT 404 Week 4 Discussion 1 | Risk Management

Risk Management (Graded)Assume you have just been assigned to a project risk team composed of five members. Your task, as project manager, is to develop a process for handling risks to the project. Because this is the first time your organization has formally set up a risk team for a project, it is hoped that your team will develop a process that can be used on all future projects. Your first team meeting is next Monday morning. Each team member has been asked to prepare for the meeting by devel..

$5.00

MGMT 404 Week 4 Discussion 2 | Risk Management Part II

MGMT 404 Week 4 Discussion 2 | Risk Management Part II

Risk Management Part II (Graded) As the work of your risk management team (from the first discussion question) continues, the discussion of your team’s risk management plan outline moves on and considers the following questions: How should the risks be prioritized? Who should do the prioritization of the project risks? How should project risks be monitored and controlled? Who should develop risk responses and contingency plans? Who should own these responses and plans?…..

$5.00

MGMT 404 Week 4 | Quiz

MGMT 404 Week 4 | Quiz

MGMT 404 Week 4 Quiz 1.   (TCO 1) Which document is created during the initiation phase of a project? (Points : 5)2.   (TCO 1) Projects have specific attributes. Which of the following is not an attribute of a project? (Points : 5)3.   (TCO 1) The purpose of a project charter is to4.   (TCO 1) Which document on a project authorizes the project manager to begin work on the project? (Points : 5)5.   (TCO 2) Which step of the project life cycle..

$10.00

MGMT 404 Week 5 Discussion 1 | Case Study: The Problems of Multitasking

MGMT 404 Week 5 Discussion 1 | Case Study: The Problems of Multitasking

Case Study: The Problems of Multitasking (Graded) – 71 Pages Read Case Study 12.1: The Problems of Multitasking.  Answer The Following Questions:How does multitasking confuse the resource availability of project team personnel?In modern organizations, it is impossible to eliminate multitasking for the average employee. Why?How would resource loading or resource leveling help address multitasking situations?…..

$5.00

MGMT 404 Week 5 Discussion 2 | Reducing Project Duration

MGMT 404 Week 5 Discussion 2 | Reducing Project Duration

Reducing Project DurationIn your own words, describe crashing, fast tracking, and scope reduction as means of schedule compression. When would each be appropriate? Which methods would you consider better first-choice methods by most project sponsors? Would any of these methods apply to Agile projects? How does Agile address schedule compression? Let’s take a couple of scenarios. We are going to talk about the PM’s contingency budget tonight. That is the excess (10-15%) the PM has planned as a ..